Just in time staffing request
Request a Strong Staffing substitute to cover last minute absences, time off and vacancies.
Search or filter to find updates and announcements from an office, department, or the Administration and Finance division.
11–20 of 35 announcements
Request a Strong Staffing substitute to cover last minute absences, time off and vacancies.
Responsible for the procurement of service and materials used by the Facilities organization in the operation and maintenance of the University’s physical spaces, we source and stock parts and materials and bid, audit, and manage vendors.
Public portal into the Medical Center Energy Management Information System (EMIS)
Request routine (NOT EMERGENCY) facilities services online, check work request status, or get associated costs. An Active Directory login is required.
Request service for non-emergency building and system issues such as painting, plumbing, hvac, electric, locksmith, signage or elevator problems. Our Customer Service Center will open a work order with the appropriate office.
Responsible for the execution of the University of Rochester’s major construction and renovation projects: typical services include management of design, engineering and construction services, and professional service contracts.
The University of Rochester requires pre-qualification of architects, engineers, and construction contractors on major capital projects to ensure that work is performed only by highly qualified contractors. This is the current list of pre-approved architects and engineers eligible to bid and perform work at the University.
The University of Rochester requires pre-qualification of architects, engineers, and construction contractors on major capital projects to ensure that work is performed only by highly qualified contractors. This is the current list of pre-approved construction contractors eligible to bid and perform work at the University.